How Long Do Permits and Design Take in Los Angeles?

By the WOW Construction Group TeamPublished Last updated

Leer en español

Quick answer

In Los Angeles, design and permits together take about 4–8 weeks for a kitchen remodel and 3–5 months for an ADU. Construction can't start until the city approves the plans. WOW prepares the plans, submits them and answers plan-check corrections.

WOW’s completed second-story addition in Sherman Oaks

Permits are usually the part of a project homeowners underestimate. Construction can't start until the city approves the plans, and the time that takes depends on the kind of project and the city you're in. Here are the realistic ranges we plan around in Los Angeles.

Design and permit timelines by project type

ProjectDesign + permitsConstructionTotal
Kitchen remodel4–8 weeks6–12 weeks3–5 months
Whole-home remodel2–4 months3–6 months6–10 months
Garage conversion2–4 months3–5 monthsabout 5–9 months
ADU3–5 months4–7 months8–12 months
Home addition3–6 months4–6 months (first floor), 6–9 months (second story)9–15 months
Custom homeabout 6–8 months (feasibility 1–2, design 3, permits 2–3)3–5 months10–12 months

These ranges come from our own LA projects. Your city and the complexity of the plans can push a project to either end.

Why permit times vary

  • The city. LA City’s LADBS (Los Angeles Department of Building and Safety), Burbank, Glendale, Pasadena and other cities each have their own building departments, rules and backlogs.
  • Plan check corrections. The city reviews your plans and almost always sends back corrections. How fast and how well those are answered matters a lot.
  • Extra reviews. Hillside lots, coastal zones, historic overlays and HOAs can add review steps.
  • Engineering. Structural work (removing walls, second stories, hillside foundations) needs engineered plans, which take time to prepare.
  • Title 24 (California's energy code). It requires energy calculations for most projects.

What we do to keep permits moving

We prepare the plan set, submit it, answer plan-check corrections, handle counter visits and schedule inspections. You get status updates along the way. City and school fees are billed at cost.

Tips to avoid permit delays

  1. Check feasibility first. Before paying for full design, confirm setbacks, height limits, soil and foundation capacity.
  2. Lock in decisions early. Changing the design after submission restarts parts of the review.
  3. Use a contractor who knows your city. Each building department works a little differently.

Common questions

How long does an ADU permit take in LA?

We plan around 3–5 months for ADU design and permits combined, not permits alone. Your city, plan-check corrections and the complexity of the plans can affect that timeline.

Can I start construction before permits are approved?

Construction can't start until the city approves the plans and required permits are approved.

Who handles plan check corrections?

WOW prepares and submits the plan set, answers plan-check corrections, handles counter visits and schedules inspections. You get status updates along the way.

Planning a project? Call WOW Construction Group at (888) 486-2182 for a free estimate and a realistic timeline for your address. Building in Los Angeles since 2014. CSLB (Contractors State License Board) #1074656.

Sources

Plan your project with WOW

About WOW Construction Group — licensed general contractor, CSLB #1074656, building in Los Angeles since 2014.

Information checked October 23, 2026. General information, not legal advice — rules can change; we confirm them for your address.