Architectural Design in Los Angeles
Blueprints With A Pulse.
Stamped, permit-ready plans drawn by people who also build them.

What's included
Your Architectural Design Options
Schematic Design
Massing, flow and feasibility before detail.
Construction Documents
Architectural drafting of floor plans, elevations and construction details — the set submitted for city review and used by the crew to build.
Permit Expediting
Counter visits, corrections, resubmittals.
Zoning & Feasibility
Setbacks, FAR, hillside rules — checked early.
Why bother
What You Get Out Of It
- Designers and builders in one room
- No 'that's not buildable' surprises
- Faster plan check turnaround
- Design-only packages available
FAQ
Questions People Actually Ask
Yes — plans are yours to build with anyone.
LA plan check typically runs 2–4 months.
Constantly.
Where we do this
Architectural Design across Los Angeles County
Architectural Design lives or dies on the local plan-check counter. Hillside ordinance in the Hills, historic overlays in Pasadena and Hancock Park, Coastal Commission on the Westside — we've run drawings through all of them.
- Hollywood
- Hollywood Hills
- West Hollywood
- Los Feliz
- Pasadena
- South Pasadena
- Altadena
- La Cañada Flintridge
- Santa Monica
- Venice
- Pacific Palisades
- Malibu
