WOW Construction Group — Los AngelesConstructionGroup

Detached ADU Construction in Los Angeles

A Whole Second Home. One Backyard.

A brand-new standalone home in your backyard — full kitchen, full bath, its own front door and its own address.

Detached backyard ADU with private entry and patio in North Hollywood
Detached backyard ADU with private entry and patio, North Hollywood.
The basics

What A Detached ADU Construction Actually Is

A detached ADU is a complete second home built from the ground up on your lot: its own foundation, its own walls, its own front door. Nothing is carved out of your existing house, so the main home keeps every square foot — and the unit gets real privacy, the kind tenants and family both pay for.

It's the most expensive ADU type and the most flexible. Because we're building new, we can place it to fit your yard, orient windows for light, and size it anywhere from a studio to a full two-story two-bedroom.

Up to 1,200 sq ft

State law guarantees at least 800 sq ft, and LA generally allows up to 1,200 sq ft for a detached unit, subject to lot coverage and setbacks.

4 ft setbacks

Detached units need 4 ft side and rear setbacks — we plan the footprint around what your lot allows.

Its own address

A permitted unit with its own final inspection and certificate — never a gray-area conversion.

Separate metering available

So the tenant pays their own power. We price both options and check your panel either way.

Cost

What Drives The Number

Detached builds are the biggest investment of the ADU types — you're paying for a full structure from the footing up. Real ranges from recent LA jobs; your exact number comes from a site visit.

Detached 1-Bedroom ADU

$230K–$390K

600–800 sq ft built new from the footing up. Full kitchen, full bath, laundry, mini-split, private entry and patio.

Detached 2-Bed / Two-Story

$390K–$600K+

900–1,200 sq ft, or two stories on a tight lot. Adds a staircase, shear walls and heavier structural engineering — and the highest rent per lot.

  • Size and story count — every extra story adds structure, stairs and engineering
  • Slope — hillside lots can need caissons or a stepped foundation, plus slope-band height limits and fire access
  • Utilities — panel capacity and the sewer lateral are the two most common surprise costs, so we check both before design
  • Site access — a tight alley or a crane day changes the number
  • Finish level — where your kitchen and bath spec lands
No call, no sales pitch

What Will Your ADU Cost?

Pick your type, size and finish level and see a real Los Angeles range in seconds. No email gate — the estimate is right there. Your exact number still comes from a site visit.

01 — Type of build

Two-story units add a staircase, shear walls and heavier engineering — real money beyond the square footage alone.

02 — Square footage

500 sq ft400–1200 sq ft

03 — Bedrooms

Bathrooms

04 — Finish level

Your estimate

$230K – $280K

Build range for a 500 sq ft new detached adu at mid-range finish, excluding architectural and engineering plans and city permit fees.

Architectural & engineering plans — not included in the estimate above
$6,500 – $15,000
City permit fees — not included in the estimate above
Varies by city

Architectural and engineering plans are not included in project prices or cost estimates. ADU plans typically cost $6,500–$15,000 and are quoted separately according to each project's size, specifications, requirements and difficulty.

City permit fees are not included in project prices or cost estimates. They are separate costs based on what the city charges for your project. WOW processes all permits for every project so clients don't have to worry, and we provide the city fee receipts for their control.

Est. monthly payment
~$2,225/mo
Typical LA rent
~$2,550/mo

Payment assumes a 20-year loan around 8.5% APR on the build midpoint, excluding architectural and engineering plans and permit fees. Rent is a neighborhood average, not a guarantee — some LA pockets run well above it, some below.

Ranges come from recent Los Angeles builds. Slab condition, sewer distance and panel capacity are the three things that move the number — we check all three on the free site visit.

Timeline

How Long It Takes

  1. Design & permits

    3–5 months. Full architectural set, plan check, corrections and utility clearances — we stand in the line, you get updates.

  2. Build

    4–7 months on site. Foundation, framing, MEP rough, inspections, insulation, drywall, finishes.

  3. Start to keys

    Call it 8–12 months — final sign-off, address assignment and the warranty package.

Permits

Permits, Handled

City permit fees are not included in project prices or cost estimates. They are separate costs based on what the city charges for your project. WOW processes all permits for every project so clients don't have to worry, and we provide the city fee receipts for their control.

  • Site plan, floor plans, elevations, Title 24 and structural — the full permit package
  • Plan check submittal, corrections and utility clearances handled by us
  • Permit processing, plan check management and engineering are in our scope
  • City, utility and school fees are billed at cost, so you see what LA actually charges
The work, up close

Real Work, Real LA Homes

Not stock art. Actual projects our crews have delivered across Los Angeles.

Detached backyard ADU with private entry and patio, North Hollywood. — Detached ADU Construction by WOW Construction Group in Los Angeles
Detached backyard ADU with private entry and patio, North Hollywood.
Detached ADU with matching stucco and roofline, Culver City. — Detached ADU Construction by WOW Construction Group in Los Angeles
Detached ADU with matching stucco and roofline, Culver City.
Backyard ADU at dusk — its own address, its own front door, Pasadena. — Detached ADU Construction by WOW Construction Group in Los Angeles
Backyard ADU at dusk — its own address, its own front door, Pasadena.
Two-story ADU on a tight lot, Woodland Hills. — Detached ADU Construction by WOW Construction Group in Los Angeles
Two-story ADU on a tight lot, Woodland Hills.
3D rendering of the ADU in the client's real backyard, approved before permits. — Detached ADU Construction by WOW Construction Group in Los Angeles
3D rendering of the ADU in the client's real backyard, approved before permits.
FAQ

Questions People Actually Ask

A detached one-bedroom typically runs $230K–$390K, and larger or two-story units $390K–$600K+. Use the calculator above for a range tuned to your size and finish level — then we confirm it with a site visit.

Design and permits run 3–5 months, build is 4–7 months. Call it 8–12 months start to keys.

State law guarantees at least 800 sq ft, and LA generally allows up to 1,200 sq ft for a detached unit, subject to lot coverage and setbacks. Detached units need 4 ft side and rear setbacks.

In most LA cases, no. State ADU law waives replacement parking for units within a half mile of transit and for garage conversions. We confirm your specific address on day one.

Yes. Permitted ADUs can be rented long-term throughout the city of Los Angeles. Short-term rental rules are stricter and vary — we'll tell you what applies at your address.

Usually yes, with more engineering. Caissons or a stepped foundation, slope-band height limits, and fire access requirements all come into play. We've done plenty of them in the Hollywood Hills and Highland Park.
Call Free EstimateFinance