WOW Construction Group — Los AngelesConstructionGroup

Attached ADU Construction in Los Angeles

More Room. Same Address.

An ADU built onto the main house — it shares a wall and often the systems, which usually makes it cheaper and faster than a detached build.

Attached ADU sharing a wall with the main house in Mar Vista
Attached ADU sharing a wall with the main house, Mar Vista.
The basics

What A Attached ADU Construction Actually Is

An attached ADU is a second dwelling built against the side or rear of your existing home. It shares a wall — and often plumbing, electrical and heating paths — which cuts some of the cost and time a standalone build carries.

It's the middle path: more privacy and independence than carving space out of the house, less site work and cost than a detached backyard unit. How big you can go depends on your lot and the main house, so we confirm what your address allows on the first visit.

Shares a wall

Built onto the existing structure, so foundation work is usually lighter than a detached build.

Shared systems, or not

Utilities can often share the main house's connections — or be metered separately so the tenant pays their own power.

Permitted, legal, rentable

Full plan check and a final inspection with an address assignment — never a gray-area conversion.

Faster than detached

Less site work and lighter foundations typically shorten the schedule.

Cost

What Drives The Number

Every attached build prices differently, because it leans on the main house — the wall, the roofline, the utilities. We don't publish a single attached range; use the calculator for a starting number and we confirm it on site.

  • How much of the shared wall and roofline gets opened and rebuilt
  • Utility upgrades — a 100-amp panel usually needs upgrading, and sewer distance matters here too
  • Layout and egress — where the new entrance and bedrooms land against the existing structure
  • Whether Title 24 and structural upgrades get triggered by what we open up
  • Finish level — kitchen, bath and flooring spec
No call, no sales pitch

What Will Your ADU Cost?

Pick your type, size and finish level and see a real Los Angeles range in seconds. No email gate — the estimate is right there. Your exact number still comes from a site visit.

01 — Type of build

Two-story units add a staircase, shear walls and heavier engineering — real money beyond the square footage alone.

02 — Square footage

500 sq ft400–1000 sq ft

03 — Bedrooms

Bathrooms

04 — Finish level

Your estimate

$205K – $245K

Build range for a 500 sq ft attached adu at mid-range finish, excluding architectural and engineering plans and city permit fees.

Architectural & engineering plans — not included in the estimate above
$6,500 – $15,000
City permit fees — not included in the estimate above
Varies by city

Architectural and engineering plans are not included in project prices or cost estimates. ADU plans typically cost $6,500–$15,000 and are quoted separately according to each project's size, specifications, requirements and difficulty.

City permit fees are not included in project prices or cost estimates. They are separate costs based on what the city charges for your project. WOW processes all permits for every project so clients don't have to worry, and we provide the city fee receipts for their control.

Est. monthly payment
~$1,950/mo
Typical LA rent
~$2,550/mo

Payment assumes a 20-year loan around 8.5% APR on the build midpoint, excluding architectural and engineering plans and permit fees. Rent is a neighborhood average, not a guarantee — some LA pockets run well above it, some below.

Ranges come from recent Los Angeles builds. Slab condition, sewer distance and panel capacity are the three things that move the number — we check all three on the free site visit.

Timeline

How Long It Takes

  1. Design & permits

    3–5 months, same package as any ADU — architectural set, plan check and utility clearances.

  2. Build

    Often at the faster end of our 4–7 month on-site range, because the structure is already there.

  3. Start to keys

    Final inspection, address assignment and the warranty package.

Permits

Permits, Handled

City permit fees are not included in project prices or cost estimates. They are separate costs based on what the city charges for your project. WOW processes all permits for every project so clients don't have to worry, and we provide the city fee receipts for their control.

  • Site plan, floor plans, elevations, Title 24 and structural — the full permit package
  • Plan check submittal, corrections and utility clearances handled by us
  • Permit processing, plan check management and engineering are in our scope
  • City, utility and school fees are billed at cost
The work, up close

Real Work, Real LA Homes

Not stock art. Actual projects our crews have delivered across Los Angeles.

Attached ADU sharing a wall with the main house, Mar Vista. — Attached ADU Construction by WOW Construction Group in Los Angeles
Attached ADU sharing a wall with the main house, Mar Vista.
Modern ADU kitchen with full-size appliances, Los Feliz. — Attached ADU Construction by WOW Construction Group in Los Angeles
Modern ADU kitchen with full-size appliances, Los Feliz.
Studio ADU interior — full kitchen, 10-ft ceilings, Highland Park. — Attached ADU Construction by WOW Construction Group in Los Angeles
Studio ADU interior — full kitchen, 10-ft ceilings, Highland Park.
FAQ

Questions People Actually Ask

It depends on how much of the main house gets opened up and what the utilities need. Most attached builds land between our garage-conversion range ($110K–$190K) and our detached range ($230K and up). Use the calculator above for a range on your size and finish level — then we confirm it with a site visit.

Attached usually wins on cost and speed because the structure and utilities are already there. Detached wins on privacy, size and the highest rent per lot. We'll walk both against your lot on the first visit.

Design and permits run 3–5 months. Construction is typically faster than a detached build since the structure is already standing.

Not required for most attached units, but it's often worth it so your tenant pays their own power. We'll price both options and check whether your existing panel needs an upgrade either way.

Yes, but only on the new value added — your existing Prop 13 base stays put. The county reassesses the ADU portion only, which is typically a small fraction of your total bill relative to the rent it generates.

Yes. Permitted ADUs can be rented long-term throughout the city of Los Angeles. Short-term rental rules are stricter and vary — we'll tell you what applies at your address.
Call Free EstimateFinance